Statistics:
- Length: 319 km
- Nothern
Terminus: Sappers Road at Lancelin
- Southern
Terminus: Corner of Newcastle Street and the
interchange
with Mitchell Freeway (SR2) at Northbridge
- Suburbs,
Towns & Localities along route:
North Perth, Joondanna, Yokine, Tuart Hill, Nollamara, Balcatta,
Westminster, Balga, Hammersley, Girrawheen, Warwick, Marangaroo,
Greenwood, Madeley, Kingsley, Woodvale, Wangara, Pearsal, Hocking,
Wanneroo, Sinagra, Ashby, Tapping, Carramar, Nowergup, Carabooda,
Yanchep, Wilbinga, Woodridge, Gabbadah, Breton Bay, Ledge Point and
Lancelin, Grey, Cervantes, Jurien Bay, Green Head, Leeman, Coolimba, Illawong and Arrowsmith
Route Numbering:
- Current:
- Multiplexed with:

- Road Authority Internal
Classification:
M34 (Wanneroo Road north of Yanchep Beach Road and all of Lancelin
Road) / H35 (remainder of Wanneroo Road and Charles Street) 1
General Information:
State Route 60 is a major arterial
route from the
Perth CBD, through Perth's northern suburbs to the northwest coastal
towns and villages north of Perth.
The route is a mix of suburban
arterial road,
divided multi-laned road and single carriageway roadway and passes
through mostly commercial, residential and agricultural lands as well
as vast tracts of pine plantations and state forests.
Multiplexes along the route include:
- 250 metres with SR81 (Warwick Rd /
Marangaroo Dr) at Warwick / Marangaroo
- 400 metres with SR83 (Whitfords Av
/ Gnangara Rd) at Kinglsey / Madeley
History:
- 2008: Extension of right
turn lanes, construction of double right turn from Wanneroo Rd into
Ocean Reef Rd westbound and a double left from Ocean Reef Rd into
Wanneroo Rd northbound. Construction of a portion of
Woodlake Retreat to form a four way intersection with Kingsway along
with an associated right turn lane on Wanneroo Rd, widening of Kingsway
and installation of traffic signals. Extension of right turn lanes and
upgrade pedestrian facilities at the junction of Wanneroo Road / Amelia
Street. Extension of right turn lanes at the corner
of Wanneroo Rd / Hepburn Av and upgrade of pedestrian
facilities. 2
- 14 March 2008: Stage one of the
Indian
Ocean Drive was opened, and consists of a $20m, 10.5 km section
starting just south of Lancelin and ending at Ocean Farm Estate. 3
4
- 19 September 2010: Stage two of Indian Ocean Drive (Lancelin to Cervantes (56km)) was officially opened. 5
The route is split into sections,
please click inside a green box on the map below:

1 Main
Roads WA Metropolitan Fact Sheet, 31 March 2008
2 Main Roads WA 2007 2008 State Black Spot
Program List
3 Highway Construction Web Site, Past Projects, Lancelin to Cervantes
4 Dr
Jim Macbeth, Tourism Management at Murdoch University
5 Main Roads Western Australia, Completed Projects, Indian Ocean Drive, Lancelin to Cervantes Stage 2
This
site
©
Paul
Rands. All rights reserved. Some portions ©
(copyright) by their respective and credited owners. Permission must be
obtained before using any images from this site. For details, please
email by clicking
here.